FIELD TOOL / 011

Sections · Quantity · Supplier basis

Transparent formula
Project takeoff · Ground materials

Aggregate Calculator

CALC / 011

Combine several areas for one aggregate material. Enter your own density, supplier basis and prices when needed.

Transparent formulaEvery section counted.
01 / Project sections

Take off each area

One aggregate material across the included sections. Calculate different materials or densities separately. Starting dimensions and depth are a hypothetical example, not a recommended layer. Added sections start blank.

Section 1
Independent footprint · Same material

Section geometric volume2.96 yd³

Project / Shared assumptions

Optional extra for site variation, handling, leveling or waste. Applied once after combining sections; it is not a compaction model. Density is blank until entered and can vary with material, grading, moisture, void space and source/product condition. Section labels never choose it.

Supplier order basis

No supplier rounding applied. Project quantities stay unchanged.

Two independent project quotes, never summed or ranked. Recommended-order cost appears only for the matching order/price basis. Mass pricing requires entered density. Use decimal points without commas.

No black boxes

Each area.
One project total.

01
Full-precision section geometryCombined volume = Σ section volumes

Section 1: Length × Width × Depth × Repeat quantity.
24 × 10 × (4 ÷ 12) × repeat 1 = 80.0000 ft³; 2.9630 yd³.

Combined = 2.9630 yd³. Displayed section values are never added back into the calculation.

02
One allowance, one entered materialProject volume = Combined + Extra

Extra = combined × 0% ÷ 100. 2.9630 yd³ + 0.0000 yd³ = 2.9630 yd³.

Estimated weight = Project volume × Density

No universal aggregate density. Enter your own for estimated weight. This density applies to one material across all sections.

03
Only the selected supplier basisRecommended order = Upward increment rounding

No supplier rounding applied. Project requirement stays unchanged.

Cost = Matching quantity × Matching price

Project costs use unrounded requirements; displayed operands are rounded. Recommended-order cost needs matching bases. Quotes are never added or ranked. 1 yd³ = 0.764554857984 m³; 1 US short ton = 907.18474 kg; 1 metric tonne = 1,000 kg.

01
Start with measured spaces

How to use the Aggregate Calculator

  1. Choose Imperial or Metric for the project.
  2. Measure the first section's footprint and uniform chosen depth. Choose Rectangle, Known Area, Circle or Triangle.
  3. Add sections for other areas. Use optional labels to identify them; repeat identical footprints with Repeat quantity.
  4. Review each section volume, then apply a single project extra if justified.
  5. Optionally enter density, a supplier rounding basis/increment and applicable prices.

The first section uses hypothetical dimensions to demonstrate arithmetic. New sections start blank, and an invalid active section withholds the combined project rather than being omitted.

02
A driveway, path and pad

Calculating multiple project sections

Each section owns a footprint geometry, depth, optional label and positive whole repeat quantity. Repeat quantity starts at one and multiplies that section's volume. Section diagrams show individual geometry; the project list keeps the quantities readable.

One session represents one aggregate material. Project-level density applies across every included section. Different materials or densities need separate calculations. A section label identifies your area; it never assigns material properties.

Remove a section when it no longer belongs in the project. At least one section remains. Remaining sections retain their own inputs even when visible numbering updates.

03
Combine before adding extra

Combining aggregate quantities

Combined geometric volume = Σ section geometric volumes. Extra = combined volume × entered allowance% ÷ 100. Project volume = combined + extra. The calculator uses full canonical section precision, not rounded display values.

Optional extra for site variation, handling, leveling or waste starts at 0%. No percentage is recommended and it is not a compaction model. If any active section is invalid, correct or remove it before obtaining a combined project requirement.

04
Footprint × uniform chosen depth

Cubic yards of aggregate

Rectangle: length × width × depth. Known Area: area × depth. Circle: π × (diameter ÷ 2)² × depth. Triangle: ½ × base × perpendicular height × depth. Multiply each single footprint by its entered repeat quantity.

Imperial converts inches to feet by dividing by 12, then cubic feet to cubic yards by dividing by 27. Metric converts centimeters to meters by dividing by 100. Exactly 1 yd³ = 0.764554857984 m³. Unit switches preserve every physical measurement and inactive geometry draft.

05
Optional material information

Estimating tons using your density

Estimated project mass = project volume × your entered density. Imperial accepts US short tons/yd³ and displays short tons and pounds. Metric accepts kg/m³ and displays metric tonnes and kilograms. A US short ton is 907.18474 kg; a metric tonne is 1,000 kg.

Density starts blank. Bulk density may depend on material, grading, moisture, void space and source/product condition. Confirm an applicable value rather than treating a general number as a standard. Volume and volume pricing remain usable without density.

There is no Aggregate density preset, no imported Gravel density and no density inferred from labels. Weight is an estimate at the density you enter.

06
Your supplier's chosen basis

Supplier order increments

No supplier rounding is selected initially. Volume increment rounds unrounded project volume upward to your entered yd³ or m³ increment. Mass increment rounds estimated project mass upward to your entered short-ton or metric-tonne increment and requires valid density.

Only the selected order basis produces a recommendation. Both increments start blank and retain their drafts when you change basis or units. Rounded mass is never converted into a new project volume. Project volume and estimated weight remain unchanged by supplier rounding.

07
Separate configured estimates

Volume pricing vs weight pricing

Project volume cost = unrounded project volume × volume price. Project mass cost = estimated project mass × mass price; density is required. Both prices start blank and zero is a valid entered quote.

With Volume increment and volume price, the recommended volume order has a matching order cost. With Mass increment and mass price, the recommended mass order has a matching order cost. Mismatched bases do not create an invented recommended-order cost; valid unrounded project quotes remain available.

Quotes are separate comparisons, never added or ranked. Delivery, tax, minimum order, fuel surcharge, installation and equipment are excluded unless already included in your entered quote. Confirm the supplier's terms.

08
Hypothetical arithmetic only

Single-section and multi-section examples

Single section: 24 ft × 10 ft × 4 in. Depth = 4 ÷ 12 = ⅓ ft; volume = 24 × 10 × ⅓ = 80 ft³; 80 ÷ 27 ≈ 2.96296 yd³, displayed 2.96 yd³.

Separate two-section example: Section A = 20 ft × 10 ft × 4 in = 66.6667 ft³. Section B = 12 ft × 4 ft × 4 in = 16 ft³. Combined unrounded volume = 82.666666… ft³; divided by 27 ≈ 3.061728… yd³, displayed 3.06 yd³. Allowance is zero and no density is attached.

Four inches is example input only, not a recommended aggregate depth. The formulas show rounded explanatory values; the calculator combines the underlying unrounded quantities. No material suitability, density or supplier increment is implied.

09
Use the tool that owns the material

Aggregate vs gravel vs rock vs road base

Aggregate is generic bulk multi-section takeoff for one material. Cubic Yard handles material-neutral volume; Gravel, Rock and Sand keep their own material-specific calculations. Pea Gravel and River Rock own their separate material and coverage workflows.

Road Base Calculator owns separate base-course quantity and optional user-planned lifts. This page publishes no road-base compaction assumptions, lift guidance, depth presets, density presets or installation design.

10
Common questions

Aggregate calculator FAQ

How do I calculate aggregate quantity?

Measure each footprint and its uniform chosen depth. The calculator combines section volumes and applies one optional project allowance. No depth or allowance is recommended.

Can I add several project areas together?

Yes. Add separate sections with their own geometry and depth. All included sections must use the same aggregate material. If materials or densities differ, calculate separate projects.

How are cubic yards calculated?

Multiply compatible footprint area and depth to get cubic feet, then divide by 27. Each section is calculated at full canonical precision before the combined result is displayed.

How do I estimate tons?

Enter a density applicable to your material and condition. Project volume times density gives estimated weight. Imperial output uses US short tons; Metric uses metric tonnes. Volume remains available without density.

Why do I need to enter density?

Aggregate bulk density varies with material, grading, moisture, void space and source/product condition. The calculator supplies no universal density and never chooses one from a section label or geometry.

How does supplier rounding work?

Choose Volume increment or Mass increment and enter your supplier's increment. Only that selected basis rounds upward. Mass ordering also requires density. Project quantities remain unchanged; No supplier rounding is the default.

Can suppliers sell aggregate by volume or weight?

Configure either or both applicable quotes. Unrounded project volume and estimated mass produce independent estimates. Recommended-order cost appears only when the selected rounding basis matches the quote basis. The calculator does not add the quotes or recommend a purchase method.

What's the difference between Aggregate and Gravel calculators?

Aggregate owns generic multi-section bulk takeoff for one material. Gravel, Rock, Sand, Pea Gravel and River Rock keep their own material-specific tools and workflows.

Is Road Base included?

Road Base is a separate live tool for single-footprint base-course quantity and optional user-planned lifts. This Aggregate tool remains generic multi-section takeoff and supplies no road-base-specific compaction assumptions, lift guidance, density or depth presets.